DLR Trials Campaign
Objectives:
- Fire Tests to verify model
- Bulk Load tests as per Minimum Performance Specification
- Pan Fire Tests as per Minimum Performance Specification
Trials Plan and schedule
- 3 box fire tests for model verification - 5 off - completed
- 3 box fire test - commission detection activation system - completed
- 12 box bulk load test - completed
- 27 box bulk load test - completed
- 60 box bulk load test - completed
- 60 box bulk load test - completed
- 270 box bulk load test as per MPS
- Pan fire tests